Thursday, April 14, 2011

Referring to the No. 4 fuel rod pool NISA Fukushima nuclear power plant

Nuclear and Industrial Safety Agency Ministry of Economy, Trade and Industry at a press conference last April 14 because it does not finish the analysis on the detection of high radiation doses over the spent fuel pool Unit 1 nuclear power plant Hukushima 4 , said at a clear conclusion about the fuel rods are not damaged. Showed also the view that it can not determine fusion.He added when nothing is happening but a little lower, larger numbers will be broken, if you are larger. Speculated that it might become a form in most healthy.The cause was detected with high radiation doses can be considered various factors. There also came out from the original gas reaction before the earthquake, has been considered and the impact of radioactive material attached to the rubble.
Geiger counter
Fukushima nuclear power plant meltdown that fact?
TEPCO and the government had covered up
Current Status of Fukushima Daiichi Nuclear Power Station
The question of radiation data, Ibaraki Environmental Radiation Monitoring Center
What happens happens in the world nuclear power plant second coming Hukushima
SPEEDI Meteorological Society of Japan
Strengthen monitoring of contaminated water level rise
Primary government Fukushima, now 50 minutes after notification of the situation
Low-level release of contaminated water, even today the primary end Hukushima
The first nuclear power plant began 10 days Hukushima high levels of contaminated water transport
High concentrations of polluted water originating in Fukushima, also remove difficulties
Nuclear accident Hukuzima see the end, the primary impetus to the movement of anti
During the height of tsunami waves surged in the Fukushima nuclear power plant was 14 to 15 m
TEPCO announced the thing to expose some of the fuel rods in Fukushima No. 1 nuclear power plant on March 12 morning
Nitrogen implantation followed by removal of contaminated water work
Strengthen monitoring of contaminated water level rise
The rise of radioactive material in the northern Fukushima Daiichi nuclear power plant
Contamination of water and wastewater to the work of the Unit 2 nuclear power plant
Work has stalled the processing of high concentrations of polluted water
Trimmed ready to move high levels of contaminated water condenser
Debris was removed using heavy equipment unattended Fukushima Daiichi nuclear power plant
Nuclear accident can not see a convergence month
High levels of contaminated water to begin transfer operations