Sunday, April 10, 2011

Low-level release of contaminated water, even today the primary end Hukushima

Fukushima No. 1 nuclear power plant damaged by earthquake Toukyoudenryoku East is expected to be finished within 10 days of the release of contaminated water into the sea of ​​low-level radioactive material began four days. Centralized waste treatment facility was empty and renovation will be conducted. Unit 2 turbine building and trench (mine) continue preparations for the acceptance of contaminated water and a high concentration. Unit 3 nuclear power plant - the first one Hukushima has built up high levels of contaminated water and the turbine building. High dose, they had power and impede the restoration work. If contaminated water is removed, the system can resume the recovery efforts needed to cool down the reactor stability. Low level of wastewater contaminated water is expected to be started from 04 tons from the 8270 central waste treatment facility. Groundwater discharge from the Unit 5 and 6, the amount would be 1300 tons. Centralized waste treatment facilities concentrated contaminated water, drying, processing and compressing the volume to be solidified. That they can earn 30,000 tons of contaminated water. Acceptance of water which is used as entrapment, including the turbine building basement and trench high concentrations of radioactive material. Contaminated water that is trapped in trench No. 2 rushing to transfer first. Since injection of fresh water continues to cool the fuel rods in nuclear reactors, the water level of the trench tends to increase gradually. At this rate it could leak into the sea from overflowing. In the turbine building first, "condenser" transferred to a tank, plans to shuffle and then concentrated in waste disposal facilities. In the turbine building, cooling systems have a power supply. The restoration work is needed, exposure to high concentrations of polluted water inaccessible from the danger of workers.
Geiger counter
Fukushima nuclear power plant meltdown that fact?
TEPCO and the government had covered up
Current Status of Fukushima Daiichi Nuclear Power Station
The question of radiation data, Ibaraki Environmental Radiation Monitoring Center
What happens happens in the world nuclear power plant second coming Hukushima
SPEEDI Meteorological Society of Japan
Strengthen monitoring of contaminated water level rise
Primary government Fukushima, now 50 minutes after notification of the situation
The first nuclear power plant began 10 days Hukushima high levels of contaminated water transport
High concentrations of polluted water originating in Fukushima, also remove difficulties
Nuclear accident Hukuzima see the end, the primary impetus to the movement of anti
During the height of tsunami waves surged in the Fukushima nuclear power plant was 14 to 15 m
TEPCO announced the thing to expose some of the fuel rods in Fukushima No. 1 nuclear power plant on March 12 morning
Nitrogen implantation followed by removal of contaminated water work
Strengthen monitoring of contaminated water level rise
The rise of radioactive material in the northern Fukushima Daiichi nuclear power plant
Contamination of water and wastewater to the work of the Unit 2 nuclear power plant
Work has stalled the processing of high concentrations of polluted water
Trimmed ready to move high levels of contaminated water condenser
Debris was removed using heavy equipment unattended Fukushima Daiichi nuclear power plant
Nuclear accident can not see a convergence month
High levels of contaminated water to begin transfer operations