Saturday, April 9, 2011

The question of radiation data, Ibaraki Environmental Radiation Monitoring Center

Status of radiation dose in Ibaraki Prefecture
March 22, 2011
Summarized on average.
Kitaibaraki City microsievert 2.031
2.829 microsievert Takahagi
Ibaraki Environmental Radiation Monitoring Center Radiation Telemetry
Hitachi City, 828 * 0.8 = 0.662 microsievert Oonuma
Hitachi City, 816 * 0.8 = 0.652 microsievert Kuzi
Even though much the same place, the numbers are completely different because the data are either fake?
Common sense is wrong to infer whether this pressure is what the government will be called Environmental Radiation Monitoring Center, Ibaraki Prefecture, a lack of uniformity would this the show?
What information have not been aligned or something that?
AC has also been washed away but do not understand commercials.
Do not be misled by false rumors? It is, well, you might say is please to provide decent information.
Spinach, which is decent but just did not conceal information to milk, there is no immediate health hazard,
Because a few years later health, and clearly should say not to eat the soup, he obviously has stopped actually shipped.
This is not a harmful rumor is true.
Towards the farmers and dairy farmers in the district who are radiation damage,
I think the government should put out a request so as not to leak any more of the sarcophagus.
The sarcophagus is only likely to contain radioactivity, and where you are The dairy and we do feel that you are having difficulty.
Even though one is not a health hazard for those who complain of not you say such a thing really wrong, AC is saying it is a hoax.
Even though some institutions to modify the data, data recovery and I'll ask the people who are without modification, it says that AC is a hoax. ACJAPAN is playing a hoax is what the commercials.
Current rumor part of false information to change Let it not be fooled by misinformation, but to paraphrase, ACJAPAN just wordplay.
The most important thing is, ACJAPAN director in that institution,
President TEPCO can see the name Akira Takashi Shimizu.
I think both are easy to imagine a deep, AC and CM are free to brainwash the public agency can use.
After all, what makes sense and again that TEPCO nominative information control.
Future, vegetables and dairy products contaminated by radioactivity, is a problem with the sale price of fish
It even happens so it is the responsibility of TEPCO, is in fact accept.
I think we should be prepared quickly in all countries of the sarcophagus, because of the still flying Byunbyun radioactive material
But I think the best option is to fly at all like this.
PM14 21 days on the way numbers are rising continuously from 22 o'clock until 17 o'clock.

Estimated Ichihara, Chiba Prefecture is one of the previous 14 hours are 26 numbers in the feces and Kita Ibaraki - 17 / 1.
Kita Ibaraki Ichihara, Chiba Prefecture to the moves and how much time,
How do you decline? Calculation was calculated that a layman.
I would change a lot in the direction of the wind, etc., but is devoid of any integrity, it would feel like this.
Geiger counter
Fukushima nuclear power plant meltdown that fact?
TEPCO and the government had covered up
Current Status of Fukushima Daiichi Nuclear Power Station
What happens happens in the world nuclear power plant second coming Hukushima
SPEEDI Meteorological Society of Japan
Strengthen monitoring of contaminated water level rise
Primary government Fukushima, now 50 minutes after notification of the situation
Low-level release of contaminated water, even today the primary end Hukushima
The first nuclear power plant began 10 days Hukushima high levels of contaminated water transport
High concentrations of polluted water originating in Fukushima, also remove difficulties
Nuclear accident Hukuzima see the end, the primary impetus to the movement of anti
During the height of tsunami waves surged in the Fukushima nuclear power plant was 14 to 15 m
TEPCO announced the thing to expose some of the fuel rods in Fukushima No. 1 nuclear power plant on March 12 morning
Nitrogen implantation followed by removal of contaminated water work
Strengthen monitoring of contaminated water level rise
The rise of radioactive material in the northern Fukushima Daiichi nuclear power plant
Contamination of water and wastewater to the work of the Unit 2 nuclear power plant
Work has stalled the processing of high concentrations of polluted water
Trimmed ready to move high levels of contaminated water condenser
Debris was removed using heavy equipment unattended Fukushima Daiichi nuclear power plant
Nuclear accident can not see a convergence month
High levels of contaminated water to begin transfer operations